LUMA OPTICS · Policy Lookup Table

signature → action · edge-executable · 12 policies loaded

Policies Enabled
11/12
Hits (24h)
619
Avg TTR
376 ms
Avg Success
95.6%
IDSignatureLayerActionTTRSuccess24hSev
PLC-001BER > 1e-8 AND Rx_SNR_drop > 2dBL1-DSPDSP tap re-train (adaptive CTLE + FFE)180ms98.2%214warn
PLC-002Rx_Power < -5.5 dBm for 3 consecutive pollsL1-OPTTX bias trim +2mA, escalate if no recovery in 5s320ms94.8%47crit
PLC-003Module_Temp > 78°C AND fan_rpm nominalL1-PHYThrottle to 400G, quarantine at 82°C90ms99.9%12crit
PLC-004Flap_Rate > 1.2%/hr on same portL2-LLDPEEPROM rollback → Golden Reference profile850ms91.2%6crit
PLC-005DWDM_λ drift > 25 GHz from ITU gridL1-OPTTEC nudge, retune within ±12.5 GHz420ms96.6%31warn
PLC-0063 consecutive heal failures on linkL3-ECMPQuarantine port, drain traffic, page NOC60ms100.0%2crit
PLC-007FEC_symbol_errors burst > 4σ baselineL1-PHYIncrease pre-emphasis, log for RMA240ms92.1%58warn
PLC-008LOS on link AND peer LLDP presentL2-LLDPReset PHY, verify TX/RX pair500ms97.7%9crit
PLC-009ECMP hash imbalance > 18% across spinesL3-ECMPReseed hash, redistribute elephant flows1200ms90.0%4warn
PLC-010Laser_bias current drift > 8% from EEPROM refL1-OPTClosed-loop bias trim, mark for lifecycle review280ms95.8%22warn
PLC-011CRC_errors > 100/min on egress queueL1-DSPRe-align SerDes lanes, retrain link210ms94.3%73warn
PLC-012PAM4 eye height < 40mV OR eye width < 0.35UIL1-DSPCTLE boost, DFE re-adapt, verify eye160ms97.1%141info